Airport Capability

Can An Embraer Phenom 300 Land at Quito (UIO)?


A clear, sourced answer — with Quito's real limits and what they mean for this aircraft.

Yes

Quito's long 13,445-foot runway accommodates the Embraer Phenom 300; the binding factor is density altitude at 7,841 feet, so plan on payload or fuel trims on warm days, but it operates routinely. Final landing performance is calculated by the operating crew for the specific date, weather, and load.

Quito at a Glance

Quito (SEQM/UIO)Detail
Runway length13,445 ft
Field elevation7,841 ft
Key limit13,445 ft runway · 7,841 ft elevation

How the Embraer Phenom 300 Measures Up

Embraer Phenom 300Spec
Classlight jet
Wingspan~52.2 ft
Max takeoff weight18,551 lb (~8 t)

In short, the Embraer Phenom 300 fits Quito's requirements. As always, the operating crew calculates final performance for the specific date, weather, and load.

Comparing options? See the Aircraft Capability hub, the Quito airport guide, or the Embraer Phenom 300 specifications.

Frequently Asked Questions

Yes. Quito's long 13,445-foot runway accommodates the Embraer Phenom 300; the binding factor is density altitude at 7,841 feet, so plan on payload or fuel trims on warm days, but it operates routinely. Final landing performance is calculated by the operating crew for the specific date, weather, and load.

Mariscal Sucre International Airport (SEQM/UIO): 13,445 ft runway · 7,841 ft elevation. Final dispatch performance is always calculated by the operating crew for the specific flight.

At 7,841 feet the thin air reduces performance, so jets carry reduced fuel or payload, especially on warm days. Its 13,445-foot runway is otherwise long enough for the aircraft covered here.

Quito suits aircraft that meet its high-altitude performance requirements — see The Jet Finder's Aircraft Capability hub for specific aircraft.

The Jet Finder

Planning a Trip to Quito?


We'll confirm the right aircraft for Quito — and arrange the charter, with vetted operators and crews current for the airport's specific requirements.